I wonder if the OP might come back here and let us know what direction he took. Bury his service or go with overhead and poles?
Fred,
That would be me. The plan is to bury the new service using directional drilling (no permits needed to open the road and the drill can steer around other cables and obstructions).
This is the local contractor that bid the job: http://www.otstel.com/
73 Martin Flynn
W2RWJ