eHam.net - Amateur Radio (Ham Radio) Community

Call Search
     

New to Ham Radio?
My Profile

Community
Articles
Forums
News
Reviews
Friends Remembered
Strays
Survey Question

Operating
Contesting
DX Cluster Spots
Propagation

Resources
Calendar
Classifieds
Ham Exams
Ham Links
List Archives
News Articles
Product Reviews
QSL Managers

Site Info
eHam Help (FAQ)
Support the site
The eHam Team
Advertising Info
Vision Statement
About eHam.net



[Articles Home]  [Add Article]  

ARRL Comments In Opposition To Part15 Modification Petition Affecting 5 GHz

from The ARRL Letter on August 9, 2018
Add a comment about this article!

ARRL Comments In 'Strong Opposition' To Part 15 Modification Petition Affecting 5 GHz:

ARRL has commented https://ecfsapi.fcc.gov/file/10730080900591/Radwin%20opposition%20to%20petition%20for%20Rule%20Making%20July%202018%20FINAL%20FCC%20FILING%20COPY.pdf in "strong opposition" to a Petition for Rulemaking https://ecfsapi.fcc.gov/file/10618241749047/Radwin%20Petition%20for%20Rulemaking.pdf by RADWIN Ltd. that seeks to amend certain Part 15 rules to permit point-to-multipoint (P2MP) communication services in portions of the 5 GHz band, at power levels now permitted only for point-to-point unlicensed systems. ARRL has focused its concern on proposed high-power P2MP operation in the band from 5.725 - 5.850 MHz, but points out that the entire 5.650 - 5.925 GHz allocation has been "subjected to a continuing series of overlays domestically" for more than 2 decades. Amateur Radio is secondary to military radars on the band.

ARRL said the Amateur Radio national "weak-signal" calling frequency of 5.760.1 GHz already has experienced a "very substantial" rise in ambient noise in many areas that has significantly affected Amateur Radio operation in the 200 kHz centered on that frequency, where extremely weak received signal levels are typical. Only low-density usage and the low-power levels permitted for unlicensed national information infrastructure (U-NII) devices have sustained "a good deal of compatibility" between Amateur Radio and U-NII devices at 5 GHz, ARRL said.

"It is quite obvious that RADWIN's proposal for simultaneous point-to-multipoint transmission, with higher input power and [effective isotropic radiated power (EIRP)], using an electronic steerable antenna system, presents an exceptionally high interference potential to ongoing, weak-signal Amateur Radio Service communications," ARRL said in its comments filed on July 30. With users located "at all points of the compass from the distribution point," ARRL said, the potential for interference to Amateur Radio "is much greater." Greater yet, ARRL noted, is the potential of interference to users of RADWIN's system.

ARRL said the FCC "has no idea at all" about aggregate noise levels in the 5 GHz band in general, while Amateur Radio and Amateur Satellite users have reported increased ambient noise levels in the band, especially near 5.760 GHz. "Both the Petition and the technical statement accompanying the Petition are silent on potential interaction between P2MP simultaneous transmission systems operating at high power, and any Amateur Radio facility," ARRL said. "As a result, the petition is fatally flawed and should be dismissed, relative to the 5.725 - 5.850 GHz band."

ARRL asserted that the FCC lacks jurisdiction to authorize Part 15 device operation by rule, "absent a specific finding that the device will not predictably cause interference." Unlicensed, very low-power Part 15 devices may not cause interference to licensed services and must accept any interference caused by a licensed station and must shut down if notified by the FCC that the device is causing harmful interference. Read more http://www.arrl.org/news/arrl-comments-in-strong-opposition-to-part-15-modification-petition-affecting-5-ghz.

Source:

The ARRL Letter

There are no comments on this article: Post One

Email Subscription
My Subscriptions
Subscriptions Help

Other News Articles
From Technical to Social Aspects, Ham Radios Have Something for Everyone:
New Version of WSJT-X:
Ham Radio Operators Tune In:
Fair Lawn ARC Completes Antenna Upgrades as Member Growth Reaches New High:
Former ARRL Headquarters Book Team Supervisor Jan Carman, K5MA (SK):